Mountain Project Logo

Suggested Page Improvements to Melting Point


Brian Koralewski
Oct 14, 2020
Protection Suggestion

12 Quickdraws (8 bolts, 2 fixed pitons, 2 anchors).  

The 2 fixed pitons are the last protection before the top anchors- the first one is hard to locate (after a small runout above last bolt, placed deep in a horizontal crack).

60m rope (Unclip rope from several draws on descent so a 60m rope will get you back to earth easily)                                             

Use long draw on 1st bolt (or backclean it) to prevent rope drag.

Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.