The Tortoise And The Hare
5.6 YDS 4c French 14 Ewbanks V UIAA 12 ZA S 4b British
Avg: 1.7 from 7 votes
Type: | Trad, 100 ft (30 m), 2 pitches |
FA: | Math Juth, 2001 |
Page Views: | 1,428 total · 9/month |
Shared By: | Dan Howell on Oct 23, 2011 |
Admins: | Leo Paik, John McNamee, Frances Fierst, Monty, Monomaniac, Tyler KC |
Your To-Do List:
Add To-Do ·
Use onX Backcountry to explore the terrain in 3D, view recent satellite imagery, and more. Now available in onX Backcountry Mobile apps! For more information see this post.
Access Issue: MM 23-29.5 - now ended daily CO 7 highway closure/delays
Details
Per Kai Bouwman: the daily CO 7 highway closure/delay access issue is no longer a problem according to CDOT the construction finished as of Nov. 11, 2022.
From CDOT: Colorado Highway 7 is closed daily from MP 23-29.5. Motorists can only travel through the area between 6-8 am and 4-7 pm. During these timeframes, pilot cars will lead alternating one-way travel. Drivers should plan for delays, and this schedule will remain in place through Memorial Day 2022.
During the closure, motorists need to take US 36 to CO 7.
codot.gov/projects/co7-lyon…
From CDOT: Colorado Highway 7 is closed daily from MP 23-29.5. Motorists can only travel through the area between 6-8 am and 4-7 pm. During these timeframes, pilot cars will lead alternating one-way travel. Drivers should plan for delays, and this schedule will remain in place through Memorial Day 2022.
During the closure, motorists need to take US 36 to CO 7.
codot.gov/projects/co7-lyon…
Protection
Standard rack up to a #3 Camalot. Rappel anchors on the route "Elanor" can be reached from the top.
0 Comments