By livinontheledge From: davis, ca Nov 28, 2012
| placing an anchor at the top of the buttress made the pitch over 35m - i.e. too long to toprope with a single 70m. you'd have to build an anchor lower in the crack to TR with a single 70m. a single 80m would work. however rope drag on the toprope made it easier to belay from above. |