Type: | Trad, 80 ft (24 m) |
FA: | T. Bubb, W. McGehee |
Page Views: | 858 total · 4/month |
Shared By: | Tony B on Aug 5, 2005 |
Admins: | Leo Paik, John McNamee, Frances Fierst, Monty, Monomaniac, Tyler KC |
Your To-Do List:
Add To-Do ·
Use onX Backcountry to explore the terrain in 3D, view recent satellite imagery, and more. Now available in onX Backcountry Mobile apps! For more information see this post.
Access Issue: 2024 Crag Closures & Temporary Trail and Raptor Closures
Details
The usual crags are closed for climbing for raptor nesting:
See: bouldercolorado.gov/service….
Click here for the trail closures. Some are M-F, some are 24/7. These impact the Bear Canyon/Fern Canyon regions primarily:
flatironsclimbing.org/tempo…
Click here bouldercolorado.gov/service… for the latest in raptor closures.
See: bouldercolorado.gov/service….
Click here for the trail closures. Some are M-F, some are 24/7. These impact the Bear Canyon/Fern Canyon regions primarily:
flatironsclimbing.org/tempo…
Click here bouldercolorado.gov/service… for the latest in raptor closures.
Description
On the ledge at the top of the route Rainbow Bridge, walk N/NE perhaps 10 meters, Passing the Routes "One In The Chamber" and "Over The Rainbow", perhaps by 4 meters to reach an left-leaning low angle crack going up the W/NW Facing wall. There is a single small tree about 1/2 way up this. Climb up the crack protecting as you see fit to reach to top of the rock. Near the top attention must be given to rock quality, as protection will be as good as you make it. This may not be the best lead for a [newbie] leader, but CAN be protected just fine with some wisdom/good judgement.
To descend, rap W/NW from the fixed anchor atop the Nebel Horn Summit, then again as for Rainbow Bridge. The webbing is new, but please consider backing this up with additional webbing and a rapid link, as it is presently a single set of webbing and single biner. It will require a total of ~8 meters to reach both threading points.
To descend, rap W/NW from the fixed anchor atop the Nebel Horn Summit, then again as for Rainbow Bridge. The webbing is new, but please consider backing this up with additional webbing and a rapid link, as it is presently a single set of webbing and single biner. It will require a total of ~8 meters to reach both threading points.
Photos
- No Photos -
1 Comment